Factory bits, weather shields, mats and tint. Put a set of the wet seat covers on today, fit perfectly, getting a centre console cover made also, Cooper STT 265/75E16's, the build begins ARB catalogue fitted! over the weekend the canopy, bull bar side steps with side rails, rear step, IPF 900 XS, fog lamps, GME TX4500 and the King Springs and Billstien 2 inch lift went on. She goes in on Thursday for the ORS drawer system with dual battery and 70L water tank. Still waiting on the roof rails and snorkel to arrive at ARB. |